A GPU server can have powerful accelerators and still wait on data. Size storage and networking around the workload’s real input rate, not peak component specifications. IDC’s 2024 Global DataSphere forecast projects 394 zettabytes of data created, captured, and replicated worldwide by 2028. That is a broad forecast, not a server-sizing target. Still, it highlights why data movement deserves attention.
For model training, measure how quickly the storage system can feed batches while several GPUs read at once. Check sustained throughput and latency during parallel reads, not just a short sequential test. For inference, prioritize predictable response times and enough network capacity for concurrent requests.
Keep an eye on the full path: storage media, controllers, network adapters, switches, and cables. One slow link can spoil the result.
SPECstorage workload benchmarks are useful references because they report performance under defined, repeatable conditions. But your own dataset may behave differently; that is easy to underestimate.
Test with representative files, realistic request sizes, and the number of workers you expect in production. Compare measured throughput with target demand, then leave headroom for peaks and future growth.