| Rated output and duty | Check the stated electrical output, operating hours, and whether the rating is for prime or standby service. These ratings are not interchangeable. | Rating plate, datasheet, and the applicable rating definitions in ISO 8528-1. |
| Fuel compatibility | Confirm the specific gas type and its allowable composition, pressure, and quality range. Natural gas, biogas, landfill gas, and other fuel gases are not automatically interchangeable. | Written fuel specifications and confirmation that the proposed engine configuration supports the project’s measured gas composition. |
| Electrical configuration | Verify the required output voltage, phase, frequency (commonly 50 Hz or 60 Hz depending on the application), and connection arrangement. | A project-specific electrical datasheet and generator alternator specifications. |
| Load response | Compare voltage and frequency response to load changes, including the proposed step-load requirements. Performance depends on the complete genset configuration and site conditions. | Applicable test results and performance data referenced to ISO 8528-5. |
| Electrical efficiency and fuel use | Compare fuel consumption or electrical efficiency at the same load points, fuel specification, and measurement basis. Avoid comparing figures stated on different bases. | Test data showing the fuel composition, ambient conditions, load, and whether auxiliary loads are included. |
| Emissions compliance | Requirements depend on the installation location, permitting rules, fuel, engine setup, and emissions-control equipment. There is no single emissions limit applicable to every project. | Applicable emissions test reports and documentation for the intended jurisdiction and project configuration. |
| Factory testing | Check that the supplier can document inspection and testing of the assembled generating set before shipment. | Factory test procedure and completed test report; ISO 8528-6 covers test methods for generating sets. |
| Noise and installation | Assess the sound measurement conditions, enclosure design, ventilation, exhaust routing, and site-specific installation constraints. | Noise test details, installation drawings, and confirmation of the measurement method, such as ISO 8528-10 where applicable. |
| Service and spare parts | Compare service coverage, response arrangements, maintenance intervals, spare-parts availability, and warranty terms for the destination country. | Written warranty, service plan, maintenance schedule, and parts-supply terms. |
| Quality documentation | Review traceability and quality-control processes for the offered equipment. A management-system certificate does not by itself prove genset performance. | Current certificates with scope and validity verified with the issuing certification body, plus product-specific test records. |